Project

Macarthur Station – Bus Drivers Amenities

We’ve built a full project page for ValuBuild — covering their services, portfolio, accreditations, and what sets them apart. Take a look and let us know what to refine.

Client: Transport for NSW
Location: Macarthur Station, Main South Line, NSW
Status: Completed

Works included site preparation, installation of the prefabricated building structure, and full compliance with approved architectural drawings, BCA, and Transport for NSW specifications. We delivered:

  • Safe access infrastructure: anti‑slip ramps, steel steps, handrails, and high‑visibility safety edging
  • Complete internal fit‑out: meals/rest area, male and female toilet facilities, custom joinery, flooring, and wall finishes
  • MEP services: air‑conditioning, ventilation, Rheem hot water system, Billi instant boiling water unit, and full electrical and plumbing installation
  • External works: weather‑protection canopies, security fencing, access gates, safety bollards, drainage, and site protection
  • Full compliance with NSW Work Health & Safety regulations, Australian Standards, and asset protection requirements

The result is a modern, durable, and fully functional facility that provides a comfortable and safe environment for staff, delivered on time and within specification.